1.8 m of steel I-beam was clipped to the ceiling beams which are fortunately designed to span the very much wider room next door and deep enough to carry the likely loads easily. The 1/2 ton chain block is also over-kill but it was already in stock. This rig has the capacity to carry large parts of the mill and lathe when the time comes to move them elsewhere.
The base started life as a piece of 12 mm plate squared up in the mill:
I also took very light cuts over both faces to get rid of the dings and scratches acquired in the scrap box. As with all the parts cutting into the rectangular outline was delayed as long as possible so that the marking out and mounting were easy. The oil drain holes were drilled and countersunk:
and the fixing holes drilled and counterbored from the other side:
With the mounting holes transferred to the crankcase and tapped the crankcase could be used as a fixture to secure the base while the pocket forming the top half of the sump was outlined with a 6 mm slot drill:
I got nervous about using the crankcase as a jig when using a bigger cutter to clean out the rest of the metal and clamped the base directly to the mill table:
Shaping the sides involved the high-speed head and a new solid carbide endmill:
and a lot of twisting and turning of the workpiece:
The final operation was to put 45-degree chamfers on the "legs"
With a final result that looks like:
on the top and like this on the underside:
A few dings and cutter overshoots are visible but nothing to affect function.
DT


